Friday, January 9, 2009

Automated Testing

Automated Testing

Test automation is used to replace or supplement traditional manual software testing with a suite of test programs. Benefits to QA Engineers include increased software quality, repeatable test procedures, and reduced testing costs. Essentially, software automation testing is using a computer system instead of a human to test a software application. Most other forms of software testing require human interaction with the software product under development

Automated Testing is done to:

1. REDUCE TESTING TIME. A typical automated test suite will run in less than 24 hours. For a sophisticated product, manual testing may require dozens of staff months to perform the same testing.
2. CONSISTENT TEST PROCEDURES. With a complex testing process manual testing often yields inconsistent coverage and results depending on the staff and schedule employed. An automated test suite ensures the same scope and process is used repeatedly each time testing is performed

3. REDUCED QA COSTS. Automated testing has an upfront cost to develop, but over the lifetime of a product it will offer substantial net savings. An average automated test suite development is 3-5 times the cost of a complete manual test cycle. Over multiple product releases with multiple cycles per release, this cost is quickly recouped

4. IMPROVED TESTING PRODUCTIVITY. With its much shorter execution time an automated test suite can be run multiple times over the course of a product development cycle

5. IMPROVED PRODUCT QUALITY. Automated testing detects functional and performance issues more efficiently

Points to consider:

1. it's important to define the purpose of taking on a test automation effort. There are several categories of testing tools each with its own purpose. Identifying what you want to automate and where in the testing life cycle will be the first step in developing a test automation strategy. Just wishing that everything should be tested faster is not a practical strategy. You need to be specific

2. Developing a test automation strategy is very important in mapping out what's to be automated, how it's going to be done, how the scripts will be maintained and what the expected costs and benefits will be

3. Many of the testing 'tools' provided by vendors are very sophisticated and use coding 'languages'. Treat the entire process of automating testing as you would any other software development effort. This includes defining what should be automated, (the requirements phase), designing test automation, writing the scripts, testing the scripts,etc. The scripts need to be maintained over the life of the product just as any program would require maintenance

4. The effort of test automation is an investment. More time and resources are needed. The benefit comes from running these automated tests every subsequent release. Therefore, ensuring that the scripts can be easily maintained becomes very important



Software Testing Training

Our Software Testing Partner
offshore Software testing

White Box Testing Techniques

White Box Testing Techniques

1. Basis Path Testing
a. Flow Graph Notation
b. Cyclomatic Complexity
c. Deriving Test Cases
d. Graph Matrices

2. Control Structure testing
a. Conditions Testing
b. Data Flow Testing
c. Loop Testing


offshore Software testing

Software Testing Training

Usability testing

Usability testing is a special form of testing that looks for bugs not in the functionality of the program, but in the layout and utility of the user interface. This step is often performed on a prototype before the actual system code is written, so it is easy to change if needed. For usability testing, you need to plan:

01. How you will choose the users for the test (what is a representative sample of your real user population?)

02. A set of tasks for the users to perform representing paths through your system showing key functionality

03. A method for getting feedback from the users - surveys, interviews, data collection in the system itself

04. How you will analyze the data you collected in order to make improvements to the user interface


offshore Software testing

Software Testing Training

Types of black box testing

Acceptance Testing / User Acceptance Testing - UAT Formal tests (often performed by a customer) to determine whether or not a system has satisfied predetermined acceptance criteria. These tests are often used to enable the customer (either internal or external) to determine whether or not to accept a system.

The test procedures that lead to formal 'acceptance' of new or changed systems. User Acceptance Testing is a critical phase of any 'systems' project and requires significant participation by the 'End Users'. To be of real use, an Acceptance Test Plan should be developed in order to plan precisely, and in detail, the means by which 'Acceptance' will be achieved. The final part of the UAT can also include a parallel run to prove the system against the current system.

The User Acceptance Test Plan will vary from system to system but, in general, the testing should be planned in order to provide a realistic and adequate exposure of the system to all reasonably expected events. The testing can be based upon the User Requirements Specification to which the system should conform.

As in any system though, problems will arise and it is important to have determined what will be the expected and required responses from the various parties concerned; including Users; Project Team; Vendors and possibly Consultants / Contractors.

In order to agree what such responses should be, the End Users and the Project Team need to develop and agree a range of 'Severity Levels'. These levels will range from (say) 1 to 6 and will represent the relative severity, in terms of business / commercial impact, of a problem with the system, found during testing. Here is an example which has been used successfully; '1' is the most severe; and '6' has the least impact :-

'Show Stopper' i.e. it is impossible to continue with the testing because of the severity of this error / bug

Critical Problem; testing can continue but we cannot go into production (live) with this problem

Major Problem; testing can continue but live this feature will cause severe disruption to business processes in live operation

Medium Problem; testing can continue and the system is likely to go live with only minimal departure from agreed business processes

Minor Problem ; both testing and live operations may progress. This problem should be corrected, but little or no changes to business processes are envisaged

'Cosmetic' Problem e.g. colours; fonts; pitch size However, if such features are key to the business requirements they will warrant a higher severity level.

The users of the system, in consultation with the executive sponsor of the project, must then agree upon the responsibilities and required actions for each category of problem. For example, you may demand that any problems in severity level 1, receive priority response and that all testing will cease until such level 1 problems are resolved.

Caution. Even where the severity levels and the responses to each have been agreed by all parties; the allocation of a problem into its appropriate severity level can be subjective and open to question. To avoid the risk of lengthy and protracted exchanges over the categorisation of problems; we strongly advised that a range of examples are agreed in advance to ensure that there are no fundamental areas of disagreement; or, or if there are, these will be known in advance and your organisation is forewarned.

Finally, it is crucial to agree the Criteria for Acceptance. Because no system is entirely fault free, it must be agreed between End User and vendor, the maximum number of acceptable 'outstandings' in any particular category. Again, prior consideration of this is advisable.

N.B. In some cases, users may agree to accept ('sign off') the system subject to a range of conditions. These conditions need to be analysed as they may, perhaps unintentionally, seek additional functionality which could be classified as scope creep. In any event, any and all fixes from the software developers, must be subjected to rigorous System Testing and, where appropriate Regression Testing.


offshore Software testing

Software Testing Training

a. User Requirements Specification - URS

a. User Requirements Specification - URS

The User Requirements Specification is a document produced by, or on behalf of your organisation, which documents the purposes for which a system is required - its functional requirements - usually in order of priority / gradation.

Whilst the URS will not usually probe the technical specification, it will nevertheless outline the expectations and, where essential may provide further detail e.g. the User Interface, say Microsoft Windows®, and the expected hardware platform etc.

The URS is an essential document which outlines precisely what the User (or customer) is expecting from this system. The term User Requirement Specification can also incorporate the functional requirements of the system or may be in a separate document labelled the Functional Requirements Specification - the FRS.

b. Test Plan

A software project test plan is a document that describes the objectives, scope, approach, and focus of a software testing effort. The process of preparing a test plan is a useful way to think through the efforts needed to validate the acceptability of a software product. The completed document will help people outside the test group understand the 'why' and 'how' of product validation. It should be thorough enough to be useful but not so thorough that no one outside the test group will read it. The following are some of the items that might be included in a test plan, depending on the particular project:

Title

Identification of software including version/release numbers
Revision history of document including authors, dates, approvals
Table of Contents
Purpose of document, intended audience
Objective of testing effort
Software product overview
Relevant related document list, such as requirements, design documents, other test plans, etc.
Relevant standards or legal requirements
Traceability requirements
Relevant naming conventions and identifier conventions
Overall software project organization and personnel/contact-info/responsibilties
Test organization and personnel/contact-info/responsibilities
Assumptions and dependencies
Project risk analysis
Testing priorities and focus
Scope and limitations of testing
Test outline - a decomposition of the test approach by test type, feature, functionality, process, system, module, etc. as applicable
Outline of data input equivalence classes, boundary value analysis, error classes
Test environment - hardware, operating systems, other required software, data configurations, interfaces to other systems
Test environment validity analysis - differences between the test and production systems and their impact on test validity.
Test environment setup and configuration issues
Software migration processes
Software CM processes
Test data setup requirements
Database setup requirements
Outline of system-logging/error-logging/other capabilities, and tools such as screen capture software, that will be used to help describe and report bugs
Discussion of any specialized software or hardware tools that will be used by testers to help track the cause or source of bugs
Test automation - justification and overview Test tools to be used, including versions, patches, etc.
Test script/test code maintenance processes and version control

c. Test Case

01. A test case is a document that describes an input, action, or event and an expected response, to determine if a feature of an application is working correctly. A test case should contain particulars such as test case identifier, test case name, objective, test conditions/setup, input data requirements, steps, and expected results.
02. Note that the process of developing test cases can help find problems in the requirements or design of an application, since it requires completely thinking through the operation of the application. For this reason, it's useful to prepare test cases early in the development cycle if possible.

d. Test Script

A test script is basically a script of test cases linked together to walk the critical pathways through an application under test. These scripts are broken down into a series of user scenarios. Each scenario contains specific instructions for the tester to carry out, including the expected results along the way


offshore Software testing

Software Testing Training

1. Equivalence Partitioning

1. Equivalence Partitioning

Divide the input domain into classes of data for which test cases can be generated.

Attempting to uncover classes of errors.

An equivalence class represents a set of valid or invalid states An input condition is either a specific numeric value, range of values, a set of related values, or a boolean condition.

Equivalence classes can be defined by:

If an input condition specifies a range or a specific value, one valid and two invalid equivalence classes defined.
If an input condition specifies a boolean or a member of a set, one valid and one invalid equivalence classes defined.

Test cases for each input domain data item developed and executed.



Software Testing Training

Our Software Testing Partner
Offshore Software Testing

6. SEI

6. SEI

'Software Engineering Institute' at Carnegie-Mellon University; initiated by the U.S. Defense Department to help improve software development processes.

7. CMM

'Capability Maturity Model', now called the CMMI ('Capability Maturity Model Integration'), developed by the SEI. It's a model of 5 levels of process 'maturity' that determine effectiveness in delivering quality software. It is geared to large organizations such as large U.S. Defense Department contractors. However, many of the QA processes involved are appropriate to any organization, and if reasonably applied can be helpful. Organizations can receive CMMI ratings by undergoing assessments by qualified auditors.

Level 1 - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Few if any processes in place; successes may not be repeatable.

Level 2 - software project tracking, requirements management, realistic planning, and configuration management processes are in place; successful practices can be repeated.

Level 3 - standard software development and maintenance processes are integrated throughout an organization; a Software Engineering Process Group is is in place to oversee software processes, and training programs are used to ensure understanding and compliance.

Level 4 - metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.

Level 5 - the focus is on continouous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.

Perspective on CMM ratings: During 1997-2001, 1018 organizations were assessed. Of those, 27% were rated at Level 1, 39% at 2, 23% at 3, 6% at 4, and 5% at 5. (For ratings during the period 1992-96, 62% were at Level 1, 23% at 2, 13% at 3, 2% at 4, and 0.4% at 5.) The median size of organizations was 100 software engineering/maintenance personnel; 32% of organizations were U.S. federal contractors or agencies. For those rated at Level 1, the most problematical key process area was in Software Quality Assurance.

8. ISO

'International Organisation for Standardization' - The ISO 9001:2000 standard (which replaces the previous standard of 1994) concerns quality systems that are assessed by outside auditors, and it applies to many kinds of production and manufacturing organizations, not just software. It covers documentation, design, development, production, testing, installation, servicing, and other processes. The full set of standards consists of: (a)Q9001-2000 - Quality Management Systems: Requirements; (b)Q9000-2000 - Quality Management Systems: Fundamentals and Vocabulary; (c)Q9004-2000 - Quality Management Systems: Guidelines for Performance Improvements. To be ISO 9001 certified, a third-party auditor assesses an organization, and certification is typically good for about 3 years, after which a complete reassessment is required. Note that ISO certification does not necessarily indicate quality products - it indicates only that documented processes are followed. Also see http://www.iso.ch/ for the latest information. In the U.S. the standards can be purchased via the ASQ web site at http://e-standards.asq.org/

9. IEEE

'Institute of Electrical and Electronics Engineers' - among other things, creates standards such as 'IEEE Standard for Software Test Documentation' (IEEE/ANSI Standard 829), 'IEEE Standard of Software Unit Testing (IEEE/ANSI Standard 1008), 'IEEE Standard for Software Quality Assurance Plans' (IEEE/ANSI Standard 730), and others.

10. ANSI

'American National Standards Institute', the primary industrial standards body in the U.S.; publishes some software-related standards in conjunction with the IEEE and ASQ (American Society for Quality).

Other software development/IT management process assessment methods besides CMMI and ISO 9000 include SPICE, Trillium, TickIT, Bootstrap, ITIL, MOF, and CobiT.